In this article, we have discussed how to calculate cubic yards of concrete. First, you need to know that inaccurate calculations can lead to several consequences. It can be in terms of weakening the structure or wasting your money. So, figuring out the project’s concrete yardage is all about evaluating the space volume to be spilled. However, the basic formula to evaluate concrete for rectangular 3D area, equation is:
Length × Width × Height
SEEK ACCURATE KNOWLEDGE ABOUT HOW TO CALCULATE CUBIC YARDS OF CONCRETE AND EVALUATE THE PERFECT AMOUNT FOR YOUR NEXT CONCRETE PROJECT WITHOUT WASTING MONEY!
Guide to Calculate Cubic Yards of Concrete
1. Cubic Yard to Cubic Feet
The purpose behind calculating cubic yards is to quickly convert length, height, and width which convert measurements into the cubic yards or desired ones.
This approach is for every type of project whether you are planning to build a driveway, sidewalk, foundation, or patio!
Hence, the most crucial thing is to calculate the right amount of concrete. This way you will never run out of time and budget.
A cubic yard is a Unit of volume that equalizes to the volume of a cube its sides are measured 3 feet in length which equals to:
Cubic Yard=3ft×3ft×3ft=27 cubic feet
Typically, concrete is measured in cubic yards which requires large volumes of material. As one cubic yard equals 27 cubic feet that converts into yards by dividing the feet by 27.
2. Common Concrete Evaluation Formula
To calculate cubic yards of concrete, you must be aware of the precise dimensions of the space. Remember, it can be different according to the shapes of the slabs.
If we talk about rectangular or square slabs then the formula is:
Cubic Yards=
Length (ft)×Width (ft)×Thickness (ft) / 27
3. Step-by-Step Example for Slabs
Let’s take an example to simplify things for you:
- Length is equal to 10 feet
- Width is equal to 10 feet
- Thickness equal to 0.5 feet
Now let’s calculate with the help of the right formula!
Cubic Yards=
10ft×10ft×0.5ft / 27
almost =1.85cubic yards
Thus, you need 1.85 yd.³ of concrete for the slab. The purpose of rounding the figure is to cover the spillage, waste, or minor miscalculations. In short, you can say that this type of project would require 2 yd.³ of concrete.
4. Concrete estimation for Circular Structures
As we discussed, the concrete calculation is different for various shapes. However, for circular structures, this formula is used to calculate the concrete measurement of a cylinder or circular structure:
Cubic Yards=
Π× [Diameter (ft)/2]2 ×Height (ft) / 27
Let’s assume that diameter = 2 feet
Height = 10 feet
Then,
Cubic Yards= 3.1416×(1ft)2 ×10ft / 27
almost= 1.16cubic yards
So almost 1.2 yd.³ will be needed to cover cylindrical or circular structures.
5. Other Concrete Structures
If you are working on different shapes of concrete structures, then the calculations can be slightly different from these.
Let’s say that your surface is sloped or irregular in shape then you have to break it down into smaller sections to calculate the formula of each chunk.
On the other hand, for vertical concrete walls, you have to calculate the volume of the wall by multiplying the length, height, and thickness (depth). After that, convert the figure into cubic yards.
Which things affect Concrete Calculation?
- The first important thing that affects concrete calculation is the thickness of the concrete pour. If your slab or structure is thicker, it means you will need more concrete.
- The second most crucial thing is the shape that helps to calculate cubic yards of concrete. However, to figure concrete yards some shapes are easier to calculate while others need more advanced calculations or dividing them into smaller chunks for exact calculations.
- It is true that whatever you do, in the end, you may waste a small amount of concrete through spillage or over-excavation.
- Depending on the project requirement, the strength and composition of the concrete mix also influence the process of calculating cubic yards of concrete.
FOR ACCURATE CONCRETE ESTIMATIONS, YOU CAN CONTACT OUR TEAM OF EXPERTS AND GET PRECISE CALCULATIONS UNDER BUDGET AND TIMELINES!
Conclusion
However, calculating cubic yards of concrete in the right way is never an easy job. You need to understand the insights of the influenced factors and how much strength your project requires. Remember, always include a margin of safety before deciding the amount of concrete. Plus, you can go with a rule of thumb for getting well-compacted results. In short, it is highly recommended to seek help from professionals to achieve desired results!